Bypass navigation and go to content
GO Train

Contact us

Send an email to the Electrification Study Team

estudy@metrolinx.com to the study team.

What's New

Updates and Reports

  • E-Study Final Report
  • Metrolinx Staff Recommendation
  • Progress Report (Draft for Discussion)
  • Network Option Report (Draft for Discussion)
  • Power Supply and Distribution Systems Technology Assessment Report (Draft for Discussion)
  • Baseline Report (Issue 1 - Draft for Comment) - July 2010
  • High Level Decision Making Framework - July 2010
  • Rolling Stock Technology Assessment for Metrolinx/GO Electrification - June 2010
more details

Stakeholder Workshop #4 - December 2010

Electrification Study Update Meeting - Georgetown Corridor – May 27, 2010

Electrification in Canada

  • Technology Case Study #1: AMT, Montreal – Reseau de Trains de Banlieue Fact Sheet
  • Technology Case Study #2: Alberta High Speed Rail Study – The Calgary to Edmonton Corridor
more details

Approach and Schedule

  • Guiding Principles
  • Study Process and Schedule
more details