Bypass navigation and go to content
GO Train

Approach and Schedule

The Electrification Study will consider the potential benefits and costs associated with replacing diesel with electric propulsion for GO trains. The study will examine and compare a full range of technology options, including future diesel and electric technologies. Important factors to be considered in comparing technologies include reliability and service, environmental and health impacts, community and land use impacts, economic and system-wide impacts, such as funding and financing.

The Study will be guided by the Terms of Reference, which were developed with advice from the Community Advisory Committee and approved by the Metrolinx Board of Directors. A joint venture team of Delcan Corporation and Arup Group Inc. is leading the study, which is expected to be completed by the end of 2010.

The GO Electrification Study is an important first step towards possible electrification of GOs rail system. When complete, the Study will provide Metrolinxs Board of Directors with the information needed to decide on how GO trains will be powered in the future.

Guiding Principles

The Electrification Study is guided by four key principles that were developed by Metrolinx and its Community Advisory Committee:

  • Objective: The study (and associated stakeholder engagement and communications program) will be conducted through a transparent, step-by-step process, so that study results are traceable and readily understood.
  • Comprehensive: The study will look at a full range of potential technologies electric, diesel and others to power GO trains in the future. The economic, social, environmental, operational and health benefits and impacts of the various technologies will be studied.
  • Inclusive: The study team will strive to engage a broad spectrum of stakeholders throughout the study process.
  • Evidence-Based: The study team will provide stakeholders with robust and credible information on technology options based on the most up-to-date research and methods to enable informed participation in the study process.

Study Process and Schedule

The Electrification Study will follow a comprehensive five phase process to provide Metrolinxs Board of Directors with the information needed to decide on how GO trains will be powered in the future. The study is expected to be completed by the end of 2010.

What's New

Updates and Reports

  • E-Study Final Report
  • Metrolinx Staff Recommendation
  • Progress Report (Draft for Discussion)
  • Network Option Report (Draft for Discussion)
  • Power Supply and Distribution Systems Technology Assessment Report (Draft for Discussion)
  • Baseline Report (Issue 1 - Draft for Comment) - July 2010
  • High Level Decision Making Framework - July 2010
  • Rolling Stock Technology Assessment for Metrolinx/GO Electrification - June 2010
more details

Stakeholder Workshop #4 - December 2010

Electrification Study Update Meeting - Georgetown Corridor – May 27, 2010

Electrification in Canada

  • Technology Case Study #1: AMT, Montreal – Reseau de Trains de Banlieue Fact Sheet
  • Technology Case Study #2: Alberta High Speed Rail Study – The Calgary to Edmonton Corridor
more details

Approach and Schedule

  • Guiding Principles
  • Study Process and Schedule
more details