Introduction to the Study

Study Process and Key Decision Making Factors

The GO Rail Network

Technology Options

Power Supply Options

Network Options

Updates and Reports

Download the E-Study Final Report

E-Study Final Report Appendices, 1 - 10:

1 High Level Decision Making Framework

8D Air Quality & Health Impacts
2 Stakeholder Engagement and Communications 8E Noise & Vibration Impacts
3 Baseline/Reference Case 8F Natural Environmental Impacts
4 Rolling Stock Technology Assessment 8G Social/Community Impacts
5 Operating Plan for the Reference Case 8H Economic Impacts
6 Electrification Systems Technology Assessment 8I Population and Community Use Analysis
7 Conceptual Design of Electrification System 8J Risk Assessment
8A Approach to Cost Benefit Analysis 9 Multiple Category Evaluation - Findings and Conclusions
8B Incremental Capital Cost Estimates 10 Implementation of Electrification Options
8C Incremental Operations and Maintenance Cost Estimates  
 
Metrolinx Staff Recommendation  
Progress Report (Draft for Discussion) [Comment]
Network Option Report (Draft for Discussion) [Comment]
Power Supply and Distribution Systems Technology Assessment Report (Draft for Discussion) [Comment]
Baseline Report (Issue 1 - Draft for Comment) - July 2010 (pdf, 3.8Mb) [Comment]
High Level Decision Making Framework - July 2010 (pdf, 431kb)
[Comment]
Board Report for the GO System Electrification Study Update - June 2010 (pdf, 42kb)
 
Rolling Stock Technology Assessment for Metrolinx/GO Electrification - June 2010 (pdf, 3Mb)
 
Board Report for the GO System Electrification Study Update - February 2010 (pdf, 78kb)  
 
Board Report for the GO System Electrification Study - October 2009 (pdf, 47kb)
 
Terms of Reference: Appendices to Board Report for the GO System Electrification Study - October 2009 (pdf, 257kb)  
   
   

What's New

Updates and Reports

  • E-Study Final Report
  • Metrolinx Staff Recommendation
  • Progress Report (Draft for Discussion)
  • Network Option Report (Draft for Discussion)
  • Power Supply and Distribution Systems Technology Assessment Report (Draft for Discussion)
  • Baseline Report (Issue 1 - Draft for Comment) - July 2010
  • High Level Decision Making Framework - July 2010
  • Rolling Stock Technology Assessment for Metrolinx/GO Electrification - June 2010
more details

Stakeholder Workshop #4 - December 2010

Electrification Study Update Meeting - Georgetown Corridor – May 27, 2010

Electrification in Canada

  • Technology Case Study #1: AMT, Montreal – Reseau de Trains de Banlieue Fact Sheet
  • Technology Case Study #2: Alberta High Speed Rail Study – The Calgary to Edmonton Corridor
more details

Approach and Schedule

  • Guiding Principles
  • Study Process and Schedule
more details