elevators and escalators status


We use this space to give you basic information about the GO station elevators or escalators that are out of service. This information is as current as possible.

Click here for up-to-date departure information from Union Station (train and bus).
If you are using a handheld device, view our mobile version.

July 25, 2008 05:39
Here is the information we have to report at 22:07, July 24, 2008:

CLARKSON GO STATION: The escalators serving the north and south parking lots are back in service. The middle escalator is out of service. Please check again for updates.
UNION STATION: Escalator to platform 6/7 from the VIA departure level is presently out of service. Please check again for updates. Escalators 2/3 and 3/4 are out of service. As part of GO Transit’s long term plan to improve Union Station, we are preparing to install a staircase which will provide direct access from a new Bay West Teamway entrance. In order to prepare for the new entrance and staircase, we need to remove escalators 2/3 and 3/4. For passengers requiring assistance, the elevator to Platform 2 is located along the southwest wall of the GO Concourse. The elevator to Platform 3A is located along the south wall of the GO Concourse. The elevator to Platform 3B & 4A is located along the south wall of the GO Concourse. Escalator 4/5 is out of service. However, the elevator to platform 4/5, located in Air Canada Centre (ACC) blue route, is still operational.
WHITBY GO STATION: The escalators at this station are out of service. GO Transit will be removing two of the escalators at the Whitby GO Station (one from the north side near the station building, as well as the one accessing the platform) and replacing them with stairs. These two locations are currently accessible by elevator for customers needing mobility assistance. We hope to have this work completed by Labour Day, September 1, 2008. The escalator serving the south exit from the west tunnel will be repaired and should be back in service approximately six to eight weeks after the repair has started. This escalator will be replaced with stairs when GO Transit installs an elevator in this location in late 2009. Please check the posting at the Whitby GO station for more information.
The message was updated by SR.

Find other information by clicking on the links below:

Train and bus on-time status
GO Bus detours
Reduced train speeds
Construction at GO stations
Other customer news

Traffic cameras (provided by City of Toronto)
Traffic cameras (provided by Ministry of Transportation)
Toronto weather forecast (provided by Environment Canada)

External links disclaimer